Working In Right of Ways and Drainage Ditches

Anyone proposing to lay, construct, maintain and/or repair cable, conduit and/or pole lines in, under, across, or along roads, streets, highways and/or drainage ditches in Fort Bend County should apply for a permit.

Please note that all forms are sized to fit on legal size paper (8.5" x 14"). If you need help completing the application or have any other questions, please Contact Us.

Application for a Permit - submit the following:

  1. Submit Construction Permit through the MyGovernmentOnline customer portal, in duplicate.
  2. Performance Construction Bond [DOC]
    Minimum is $5,000.00 or 25% of total work in County Right of Way whichever is the larger amount.
    • a. Cashiers' Check made out to Fort Bend County may be substituted for Performance Bond OR
    • b. Perpetual Construction Bond [DOC]
          Minimum: $50,000.00
    • c. Only our bond form can be used with no additions or deletions, for the County to accept. All documents must be originals. Faxed material will not be accepted.
  3. Commercial Driveways and Median opening or Median modification, New Street Crossings or Connections to Existing Streets.
  4. Vicinity Map or Key Map page, in duplicate.
  5. A detail drawing of construction, in duplicate signed and sealed by a Texas licensed professional engineer. Identify each proposed construction item by encircling or by a heavy line and label each item alphabetically to match that same item on the application form.
  6. Traffic Control Plan - Must comply with the Texas Manual on Uniform Traffic Control Devices for Streets and Highways (TMUTCD). Part VI Standards and Guides for Traffic Controls for Streets and Highway Construction, Maintenance, Utility, and Incident Management Operations.
  7. Outdoor Lighting Regulation - Submit an Outdoor Lighting plan and comply with Fort Bend County Outdoor Lighting Regulations adopted on 03/23/04.
  8. Compliance with Fort Bend County's Right-of-Way Regulations [PDF]

The completed application and all of its appurtenances shall not contain any false information nor conceal any material facts.

Construction may begin only after obtaining a Construction Permit. We will not consider early start on any construction, other than emergency situations.

Written notices are required:

  • 48 hours in advance of construction start up.
  • Evidence of review by the Commissioners' Court should be kept on the jobsite at all times and failure to do so constitutes grounds for job shutdown.
  • When construction is completed and ready for final inspection.

Mail notices to:

Permit Administrator
Fort Bend County Engineering
301 Jackson
Richmond, Texas 77469

EAOR 37: Policy advisory regarding utility and telephone company exceptions

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download AutoDesk DWF Viewer Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 2/8/2017 11:56:54 AM